Project Details

Shanghai Novartis Energy Station Retrofit
Project StoryShanghai Novartis Energy Station Retrofit
Project Story

Shanghai Novartis Energy Station Retrofit

Two gas generator sets and two gas boilers use different catalyst temperature routes within the existing plant boundary.

Start With Reusable Boundaries

The design first reviewed the existing reactors, duct interfaces, installation space, sensor locations and shutdown window. Reusing equipment reduced demolition, but every retained component still required checks for dimensions, sealing, support, pressure loss and maintenance access.

Match Each Temperature Window

The engine side retained the existing reactor and received medium-temperature catalyst matched to its operating range. A new low-temperature catalyst module was installed in the boiler flue. Dosing and control parameters were recommissioned for both routes.

Read Shared-stack Data in Context

Because the monitoring point sits downstream of the combined flue, results must be interpreted together with the active equipment, load, reference oxygen and measurement conditions.